ITAC Assessment: GT0141
ITAC logo
ITAC Assessment: GT0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product DOORS/WINDOWS-FRAMES
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area
n/a
Annual Production 70,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,554 244,725
kWh
Natural Gas $1,815 455
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,195

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $971 - $971
15,240
kWh
02 2.4133: Use most efficient type of electric motors $191 $434 $191
2,931
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,559 - $1,559
24,619
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $665 $50 $665
10,551
kWh
TOTAL RECOMMENDED $3,386 $484 $3,386
53,341
kWh
TOTAL IMPLEMENTED $3,195 $50 $3,195
50,410
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs