| Assessment Year | 1982 |
|---|---|
| Principal Product | TEXTILE FIBERS |
| NAICS |
n/a
|
| SIC | 2284: Thread Mills |
| Sales Range | $1 M to 5M |
| # of Employees | 70 |
| Plant Area |
n/a
|
| Annual Production | 24,501,613
pieces
|
| Production Hrs. Annual | 4,590
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $190,273 | 3,731,829 |
kWh
|
$0.051 |
| Natural Gas | $19,667 | 4,194 |
MMBtu
|
$4.69 |
| Fuel Oil #2 | $4,673 | 727 |
MMBtu
|
$6.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,950 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $4,259 | $3,480 |
$4,259
83,529
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,599 | $30 |
$2,599
50,996
kWh
|
- | |
| 03 | 2.2135: Repair and eliminate steam leaks | $960 | $60 | - |
$960
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $674 | $330 |
$674
13,189
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $403 | $154 |
$403
7,913
kWh
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $666 | $300 | - |
$666
-
MMBtu
|
|
| 07 | 2.2511: Insulate bare equipment | $389 | $244 | - |
$389
-
MMBtu
|
|
| TOTAL RECOMMENDED | $9,950 | $4,598 |
$7,935
155,627
kWh
|
$2,015
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs