ITAC Assessment: GT0136
ITAC logo
ITAC Assessment: GT0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product TEXTILE FIBERS
NAICS
n/a
SIC 2284: Thread Mills
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 24,501,613
pieces
Production Hrs. Annual 4,590
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,273 3,731,829
kWh
Natural Gas $19,667 4,194
MMBtu
Fuel Oil #2 $4,673 727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,259 $3,480 $4,259
83,529
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,599 $30 $2,599
50,996
kWh
-
03 2.2135: Repair and eliminate steam leaks $960 $60 - $960
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $674 $330 $674
13,189
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $403 $154 $403
7,913
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $666 $300 - $666
-
MMBtu
07 2.2511: Insulate bare equipment $389 $244 - $389
-
MMBtu
TOTAL RECOMMENDED $9,950 $4,598 $7,935
155,627
kWh
$2,015
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs