ITAC Assessment: GT0114
ITAC logo
ITAC Assessment: GT0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MARGARINE,SALAD DRESSING
NAICS
n/a
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 70,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,139 3,943,728
kWh
Natural Gas $124,061 32,385
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,834 - $6,834
133,939
kWh
-
02 2.2694: Use highest temperature for chilling or cold storage $2,795 $500 - $2,795
-
MMBtu
03 2.2223: Enhance sensitivity of temperature control and cutoff $1,049 $2,500 - $1,049
-
MMBtu
04 2.2437: Recover waste heat from equipment $24,416 $48,000 - $24,416
-
MMBtu
TOTAL RECOMMENDED $35,094 $51,000 $6,834
133,939
kWh
$28,260
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs