ITAC Assessment: DS0172
ITAC logo
ITAC Assessment: DS0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Fire and Gas Detection Products
NAICS
n/a
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 100,000
ft2
Annual Production 45,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,633 3,102,579
kWh
Electricity Demand $54,834 7,164
kW-mo/yr
Electricity Fees $18,044 -
Natural Gas $24,349 4,972
MMBtu
LPG $576 45
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,907 $8,927 $5,382
145,662
kWh
$2,525
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $569 $864 $569
15,240
kWh
- - - - -
03 2.6218: Turn off equipment when not in use $1,033 $2,718 $1,033
27,843
kWh
- - - - -
04 2.2437: Recover waste heat from equipment $721 $1,770 - - $721
-
MMBtu
- - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,262 $4,230 - - - $1,262
-
lb
- -
06 4.445: Install equipment to move product $1,287 $450 - - - - $1,287 -
07 4.515: Install shelves / racks to utilize unused space $4,500 $17,260 - - - - - $4,500
TOTAL RECOMMENDED $17,279 $36,219 $6,984
188,745
kWh
$2,525
-
kW-mo/yr
$721
-
MMBtu
$1,262
-
lb
$1,287 $4,500
TOTAL IMPLEMENTED $10,771 $16,739 $6,984
188,745
kWh
$2,525
-
kW-mo/yr
- $1,262
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs