| Assessment Year | 2004 |
|---|---|
| Principal Product | Dairy |
| NAICS | 112120: Dairy Cattle and Milk Production |
| SIC | 241: Logging |
| Sales Range | $1 M to 5M |
| # of Employees | 20 |
| Plant Area |
1,000,000
ft2
|
| Annual Production | 29,200,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $25,551 | 2,947 |
kWh
|
$8.67 |
| Electricity Demand | $7,799 | 2,947 |
kW-mo/yr
|
$2.65 |
| Electricity Fees | $4,700 | - |
|
- |
| LPG | $47,300 | 430 |
MMBtu
|
$110.00 |
| Fuel Oil #2 | $47,300 | 3,660 |
MMBtu
|
$12.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,890 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $904 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $33,626 | $16,440 |
$21,924
548,100
kWh
|
$7,102
-
kW-mo/yr
|
$4,600
-
MMBtu
|
|
| 02 | 2.2622: Replace existing chiller with high efficiency model | $1,848 | $10,300 |
$1,434
37,741
kWh
|
$414
-
kW-mo/yr
|
- | |
| 03 | 2.9112: Use solar heat to heat water | $1,305 | $1,740 | - | - |
$1,305
-
MMBtu
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $988 | - |
$636
16,740
kWh
|
$352
-
kW-mo/yr
|
- | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $749 | $3,500 |
$390
10,267
kWh
|
$359
-
kW-mo/yr
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $219 | $79 |
$155
4,069
kWh
|
$64
-
kW-mo/yr
|
- | |
| 07 | 2.2511: Insulate bare equipment | $155 | $240 |
$155
4,079
kWh
|
- | - | |
| TOTAL RECOMMENDED | $38,890 | $32,299 |
$24,694
620,996
kWh
|
$8,291
-
kW-mo/yr
|
$5,905
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $904 | $3,740 |
$545
14,346
kWh
|
$359
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs