ITAC Assessment: DS0170
ITAC logo
ITAC Assessment: DS0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Treated lumber
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 62,460
ft2
Annual Production 27,942,000
thousand feet
Production Hrs. Annual 4,940
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,575 562,720
kWh
Electricity Demand $18,700 2,304
kW-mo/yr
Electricity Fees $1,732 -
Natural Gas $7,630 1,623
MMBtu
LPG $3,759 184
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $274 $723 $147
3,224
kWh
$127
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $120 $324 $120
2,638
kWh
- - - - -
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $640 $515 $377
8,499
kWh
$263
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $589 $224 $404
9,086
kWh
$185
-
kW-mo/yr
- - - -
05 3.5313: Increase amount of waste recovered for resale $1,419 $45 - - $590
-
lb
$390 - $439
06 3.5212: Regrind, reuse, or sell scrap plastic parts $2,360 $3,145 - - $2,360
-
lb
- - -
07 4.514: Re-arrange equipment layout to reduce handling costs $26,520 $2,940 - - - $26,520 - -
08 4.211: Consider use / purchase of bulk materials where possible $1,980 $1,350 - - - - $1,980 -
09 4.441: Install automatic packing equipment $5,407 $3,500 - - - $5,407 - -
10 4.131: Modify process to reduce material use/cost $9,195 $2,627 - - - - $9,195 -
TOTAL RECOMMENDED $48,504 $15,393 $1,048
23,447
kWh
$575
-
kW-mo/yr
$2,950
-
lb
$32,317 $11,175 $439
TOTAL IMPLEMENTED $2,008 $269 $404
9,086
kWh
$185
-
kW-mo/yr
$590
-
lb
$390 - $439
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs