Assessment Year | 2000 |
---|---|
Principal Product | Treated lumber |
NAICS |
n/a
|
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
62,460
ft2
|
Annual Production | 27,942,000
thousand feet
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $24,575 | 562,720 |
kWh
|
$0.044 |
Electricity Demand | $18,700 | 2,304 |
kW-mo/yr
|
$8.12 |
Electricity Fees | $1,732 | - |
|
- |
Natural Gas | $7,630 | 1,623 |
MMBtu
|
$4.70 |
LPG | $3,759 | 184 |
MMBtu
|
$20.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,504 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,008 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $274 | $723 |
$147
3,224
kWh
|
$127
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $120 | $324 |
$120
2,638
kWh
|
- | - | - | - | - | |
03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $640 | $515 |
$377
8,499
kWh
|
$263
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $589 | $224 |
$404
9,086
kWh
|
$185
-
kW-mo/yr
|
- | - | - | - | |
05 | 3.5313: Increase amount of waste recovered for resale | $1,419 | $45 | - | - |
$590
-
lb
|
$390 | - | $439 | |
06 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $2,360 | $3,145 | - | - |
$2,360
-
lb
|
- | - | - | |
07 | 4.514: Re-arrange equipment layout to reduce handling costs | $26,520 | $2,940 | - | - | - | $26,520 | - | - | |
08 | 4.211: Consider use / purchase of bulk materials where possible | $1,980 | $1,350 | - | - | - | - | $1,980 | - | |
09 | 4.441: Install automatic packing equipment | $5,407 | $3,500 | - | - | - | $5,407 | - | - | |
10 | 4.131: Modify process to reduce material use/cost | $9,195 | $2,627 | - | - | - | - | $9,195 | - | |
TOTAL RECOMMENDED | $48,504 | $15,393 |
$1,048
23,447
kWh
|
$575
-
kW-mo/yr
|
$2,950
-
lb
|
$32,317 | $11,175 | $439 | ||
TOTAL IMPLEMENTED | $2,008 | $269 |
$404
9,086
kWh
|
$185
-
kW-mo/yr
|
$590
-
lb
|
$390 | - | $439 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs