ITAC Assessment: DS0162
ITAC logo
ITAC Assessment: DS0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Animal Feed
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 36
Plant Area 20,000
ft2
Annual Production 54,000
ton
Production Hrs. Annual 4,420
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,429 1,472,743
kWh
Electricity Demand $37,851 6,396
kW-mo/yr
Electricity Fees $14,732 -
Natural Gas $17,951 6,112
MMBtu
LPG $2,114 309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2515: Use optimum thickness insulation $4,196 $3,997 n/a - - $4,196
-
MMBtu
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $762 - n/a - - $762
-
MMBtu
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,888 $6,600 n/a $2,114
50,117
kWh
$405
-
kW-mo/yr
$(-631.0)
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,182 $1,702 n/a $791
18,757
kWh
$391
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $499 $105 n/a $499
8,499
kWh
- - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $252 - n/a - - - $252
-
lb
-
07 4.611: Begin a practice of predictive / preventative maintenance $420 - n/a - - - - $420
TOTAL RECOMMENDED $9,199 $12,404 $3,404
77,373
kWh
$796
-
kW-mo/yr
$4,327
-
MMBtu
$252
-
lb
$420
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs