ITAC Assessment: AS0018
ITAC logo
ITAC Assessment: AS0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product LAMINATED GLASS
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area
n/a
Annual Production 1
thousand feet
Production Hrs. Annual 1,968
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,808 420,868
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $60 $159 $60
586
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $92 - $92
879
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,377 $1,000 $8,377
82,356
kWh
04 2.2437: Recover waste heat from equipment $392 $1,170 $392
3,810
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $400 $100 $400
3,810
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $794 $34 $794
7,913
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $84 $168 $84
879
kWh
TOTAL RECOMMENDED $10,199 $2,631 $10,199
100,233
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs