ITAC Assessment: DS0160
ITAC logo
ITAC Assessment: DS0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Potato Chips, Curls, Tortilla Chips, Carmel Corn
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 160,370
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,083 4,725,967
kWh
Electricity Demand $107,950 15,888
kW-mo/yr
Electricity Fees $3,632 -
Natural Gas $224,032 90,990
MMBtu
LPG $9,180 2,050
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $139,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.6232: Install set-back timers $2,918 $1,540 - - $2,918
-
MMBtu
- -
02 2.2437: Recover waste heat from equipment $35,611 $39,100 - - $35,611
-
MMBtu
- -
03 2.2515: Use optimum thickness insulation $1,667 $3,367 - - $1,667
-
MMBtu
- -
04 2.7135: Install occupancy sensors $910 $972 $910
31,360
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,312 $7,942 $1,415
49,824
kWh
$897
-
kW-mo/yr
- - -
06 3.4111: Use closed cycle process to minimize waste water production $13,111 $3,574 - - - - $13,111
-
Tgal
07 4.441: Install automatic packing equipment $82,554 $70,000 - - - $82,554 -
08 4.444: Install system to collect scrap $433 $100 - - - $433 -
TOTAL RECOMMENDED $139,516 $126,595 $2,325
81,184
kWh
$897
-
kW-mo/yr
$40,196
-
MMBtu
$82,987 $13,111
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs