Assessment Year | 2000 |
---|---|
Principal Product | Potato Chips, Curls, Tortilla Chips, Carmel Corn |
NAICS |
n/a
|
SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
160,370
ft2
|
Annual Production | 45,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $137,083 | 4,725,967 |
kWh
|
$0.029 |
Electricity Demand | $107,950 | 15,888 |
kW-mo/yr
|
$6.79 |
Electricity Fees | $3,632 | - |
|
- |
Natural Gas | $224,032 | 90,990 |
MMBtu
|
$2.46 |
LPG | $9,180 | 2,050 |
MMBtu
|
$4.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $139,516 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $2,918 | $1,540 | - | - |
$2,918
-
MMBtu
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $35,611 | $39,100 | - | - |
$35,611
-
MMBtu
|
- | - | |
03 | 2.2515: Use optimum thickness insulation | $1,667 | $3,367 | - | - |
$1,667
-
MMBtu
|
- | - | |
04 | 2.7135: Install occupancy sensors | $910 | $972 |
$910
31,360
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,312 | $7,942 |
$1,415
49,824
kWh
|
$897
-
kW-mo/yr
|
- | - | - | |
06 | 3.4111: Use closed cycle process to minimize waste water production | $13,111 | $3,574 | - | - | - | - |
$13,111
-
Tgal
|
|
07 | 4.441: Install automatic packing equipment | $82,554 | $70,000 | - | - | - | $82,554 | - | |
08 | 4.444: Install system to collect scrap | $433 | $100 | - | - | - | $433 | - | |
TOTAL RECOMMENDED | $139,516 | $126,595 |
$2,325
81,184
kWh
|
$897
-
kW-mo/yr
|
$40,196
-
MMBtu
|
$82,987 |
$13,111
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs