Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Cheese and Whey Products
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 121,500
ft2
Annual Production 73,600,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $424,178 17,199,297
kWh
Electricity Demand $318,191 33,084
kW-mo/yr
Electricity Fees $22,915 -
Natural Gas $306,686 129,662
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $170,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $159,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2515: Use optimum thickness insulation $9,729 $1,887 - $9,729
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $7,418 $1,190 - $7,418
-
MMBtu
-
03 2.7135: Install occupancy sensors $922 $648 $922
36,928
kWh
- -
04 4.611: Begin a practice of predictive / preventative maintenance $400 - - - $400
05 4.441: Install automatic packing equipment $152,096 $54,500 $(-212.0)
(-8,499)
kWh
- $152,308
TOTAL RECOMMENDED $170,565 $58,225 $710
28,429
kWh
$17,147
-
MMBtu
$152,708
TOTAL IMPLEMENTED $159,914 $55,690 $(-212.0)
(-8,499)
kWh
$7,418
-
MMBtu
$152,708
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs