ITAC Assessment: DS0124
ITAC logo
ITAC Assessment: DS0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Canned and Frozen Peas and Corn
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $50
M
to 100
M
# of Employees 1,400
Plant Area 467,083
ft2
Annual Production 146,466,247
lb
Production Hrs. Annual 2,304
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $825,927 20,642,732
kWh
Electricity Demand $264,685 41,040
kW-mo/yr
Electricity Fees $42,608 -
Natural Gas $309,918 111,876
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,385 $21,938 $3,464
101,993
kWh
$921
-
kW-mo/yr
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,039 $2,213 - $2,039
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $30,549 $25,900 - - $30,549 - -
04 2.2511: Insulate bare equipment $15,838 $30,000 - - - $15,838
-
MMBtu
-
05 3.2176: Increase use of automation $6,750 $10,000 - - - - $6,750
06 3.2176: Increase use of automation $15,206 $40,000 $8,456
120,750
kWh
- - - $6,750
TOTAL RECOMMENDED $74,767 $130,051 $11,920
222,743
kWh
$2,960
-
kW-mo/yr
$30,549 $15,838
-
MMBtu
$13,500
TOTAL IMPLEMENTED $34,934 $47,838 $3,464
101,993
kWh
$921
-
kW-mo/yr
$30,549 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs