ITAC Assessment: DS0118
ITAC logo
ITAC Assessment: DS0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Rollformed Steel Roofing
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 98,550
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 4,992
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,242 734,174
kWh
Electricity Demand $14,765 2,040
kW-mo/yr
Electricity Fees $744 -
Natural Gas $15,620 3,045
MMBtu
LPG $4,781 629
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,188

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,578 $5,326 $1,584
46,600
kWh
$994
-
kW-mo/yr
- - -
02 2.3212: Optimize plant power factor $610 $600 - - $610 - -
03 3.5316: Contract a wood pallet recycling company $3,300 $160 - - - - $3,300
04 3.1191: Change procedures / equipment / operating conditions $1,400 $2,200 - - - - $1,400
05 3.1172: Revise raw material specs $2,372 - - - - $2,372 -
TOTAL RECOMMENDED $10,260 $8,286 $1,584
46,600
kWh
$994
-
kW-mo/yr
$610 $2,372 $4,700
TOTAL IMPLEMENTED $3,188 $5,926 $1,584
46,600
kWh
$994
-
kW-mo/yr
$610 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs