ITAC Assessment: DS0112
ITAC logo
ITAC Assessment: DS0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Corrugated containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 157
Plant Area 138,400
ft2
Annual Production 7,200,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,935 4,606,389
kWh
Electricity Demand $76,079 9,948
kW-mo/yr
Electricity Fees $12,973 -
Natural Gas $144,753 104,954
MMBtu
Fuel Oil #2 $15,952 2,980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,447 $21,490 $3,868
128,957
kWh
$1,579
-
kW-mo/yr
- - -
02 2.3137: Use power during off-peak periods $3,019 $1,375 - $3,019
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $12,228 $12,710 $(-1,651.0)
(-55,100)
kWh
$(-652.0)
-
kW-mo/yr
$14,531
-
MMBtu
- -
04 2.2437: Recover waste heat from equipment $775 $680 - - $775
-
MMBtu
- -
05 3.7121: Improve handling practices $360 $352 - - - - $360
06 2.6124: Establish equipment maintenance schedule $259 - - - - $259 -
TOTAL RECOMMENDED $22,088 $36,607 $2,217
73,857
kWh
$3,946
-
kW-mo/yr
$15,306
-
MMBtu
$259 $360
TOTAL IMPLEMENTED $8,725 $22,865 $3,868
128,957
kWh
$4,598
-
kW-mo/yr
- $259 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs