| Assessment Year | 1998 |
|---|---|
| Principal Product | Thermal injection moldings |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 190 |
| Plant Area |
92,000
ft2
|
| Annual Production | 4,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $193,687 | 4,646,835 |
kWh
|
$0.042 |
| Electricity Demand | $24,353 | 11,666 |
kW-mo/yr
|
$2.09 |
| Electricity Fees | $3,543 | - |
|
- |
| Natural Gas | $23,561 | 4,133 |
MMBtu
|
$5.70 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,456 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,604 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,394 | $7,486 |
$5,910
140,680
kWh
|
$484
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,145 | - | - |
$11,145
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.1335: Replace gasoline with diesel, lpg, or natural gas | $10,786 | $30,000 | - | - | - | - | $10,786 | |
| 04 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $9,066 | $4,500 | - | - | - |
$9,066
-
lb
|
- | |
| 05 | 3.4116: Meter recycled water (to reduce sewer charges) | $3,065 | $1,600 | - | - |
$3,065
-
Tgal
|
- | - | |
| TOTAL RECOMMENDED | $40,456 | $43,586 |
$5,910
140,680
kWh
|
$11,629
-
kW-mo/yr
|
$3,065
-
Tgal
|
$9,066
-
lb
|
$10,786 | ||
| TOTAL IMPLEMENTED | $20,604 | $9,086 |
$5,910
140,680
kWh
|
$11,629
-
kW-mo/yr
|
$3,065
-
Tgal
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs