ITAC Assessment: DS0094
ITAC logo
ITAC Assessment: DS0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Hydraulic Pumps and Rams
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 211,000
ft2
Annual Production 1,200
ton
Production Hrs. Annual 4,160
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,696 6,234,467
kWh
Electricity Demand $177,924 14,832
kW-mo/yr
Electricity Fees $3,817 -
Natural Gas $17,985 7,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.2628: Utilize a less expensive cooling method $57,050 $532,891 $12,338
478,312
kWh
$35,469
-
kW-mo/yr
$9,243
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,969 $90 $1,177
45,721
kWh
$792
-
kW-mo/yr
- - - -
03 3.4151: Minimize water usage $211 - - - - $134
-
Tgal
- $77
-
Tgal
04 3.5315: Lease / purchase baler; sell cardboard to recycler $2,665 $4,500 - - - - $2,665
-
lb
-
TOTAL RECOMMENDED $61,895 $537,481 $13,515
524,033
kWh
$36,261
-
kW-mo/yr
$9,243
-
MMBtu
$134
-
Tgal
$2,665
-
lb
$77
-
Tgal
TOTAL IMPLEMENTED $59,230 $532,981 $13,515
524,033
kWh
$36,261
-
kW-mo/yr
$9,243
-
MMBtu
$134
-
Tgal
- $77
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs