ITAC Assessment: DS0091
ITAC logo
ITAC Assessment: DS0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Cheese and Whey Products
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 172
Plant Area 111,320
ft2
Annual Production 180,522,120
lb
Production Hrs. Annual 8,760
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,872 18,976,847
kWh
Electricity Demand $209,698 31,392
kW-mo/yr
Electricity Fees $600 -
Natural Gas $517,013 211,048
MMBtu
LPG $109,250 21,850
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $199,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $196,074

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $886 $900 $886
52,169
kWh
- - - -
02 2.2511: Insulate bare equipment $3,234 $882 - - $3,234
-
MMBtu
- -
03 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $121,380 $250,000 $6,632
390,094
kWh
$(-1,764.0)
-
kW-mo/yr
$116,512
-
MMBtu
- -
04 3.5212: Regrind, reuse, or sell scrap plastic parts $760 $800 - - - $760
-
lb
-
05 3.3133: Use other waste concentration methods $1,784 $10,000 - - - $1,784
-
lb
-
06 2.8212: Reduce delivery schedules $71,460 $50,000 - - - - $71,460
TOTAL RECOMMENDED $199,504 $312,582 $7,518
442,263
kWh
$(-1,764.0)
-
kW-mo/yr
$119,746
-
MMBtu
$2,544
-
lb
$71,460
TOTAL IMPLEMENTED $196,074 $300,882 $6,632
390,094
kWh
$(-1,764.0)
-
kW-mo/yr
$119,746
-
MMBtu
- $71,460
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs