ITAC Assessment: DS0088
ITAC logo
ITAC Assessment: DS0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Steam Generators
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 83,600
ft2
Annual Production 40
pieces
Production Hrs. Annual 4,108
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,898 2,352,286
kWh
Electricity Demand $55,027 6,840
kW-mo/yr
Electricity Fees $5,592 -
Natural Gas $69,657 16,204
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,136

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,136 $75 $836
26,964
kWh
$300
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,164 $5,126 $1,132
36,635
kWh
$1,032
-
kW-mo/yr
- -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $28,000 $4,500 - - $28,000
-
lb
-
04 4.122: Develop standard procedures to improve internal yields $82,160 $340 - - - $82,160
TOTAL RECOMMENDED $113,460 $10,041 $1,968
63,599
kWh
$1,332
-
kW-mo/yr
$28,000
-
lb
$82,160
TOTAL IMPLEMENTED $29,136 $4,575 $836
26,964
kWh
$300
-
kW-mo/yr
$28,000
-
lb
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs