ITAC Assessment: DS0087
ITAC logo
ITAC Assessment: DS0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Hand Rollers and Auto Sleeves
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 83,235
ft2
Annual Production 114
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,978 868,699
kWh
Electricity Demand $4,416 2,208
kW-mo/yr
Electricity Fees $2,942 -
Natural Gas $16,029 3,123
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,061 $60 $2,925
72,685
kWh
$136
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,586 $10,503 $2,288
56,858
kWh
$298
-
kW-mo/yr
- - - -
03 3.5316: Contract a wood pallet recycling company $675 $100 - - - - - $675
04 3.7131: Use a rag recycle service $2,250 $750 - - - $2,250
-
lb
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $3,009 $4,500 - - - $3,009
-
lb
- -
06 3.2121: Convert to electrostatic powder coating $3,515 $6,000 - - $1,715
-
gal
- $1,800 -
07 4.513: Re-arrange equipment layout to reduce labor costs $57,278 $44,580 - - - - - $57,278
TOTAL RECOMMENDED $72,374 $66,493 $5,213
129,543
kWh
$434
-
kW-mo/yr
$1,715
-
gal
$5,259
-
lb
$1,800 $57,953
TOTAL IMPLEMENTED $8,826 $6,810 $2,925
72,685
kWh
$136
-
kW-mo/yr
$1,715
-
gal
$2,250
-
lb
$1,800 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs