Assessment Year | 1997 |
---|---|
Principal Product | Printed Paper Boxes |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
214,000
ft2
|
Annual Production | 4,000,000,000
pieces
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $338,690 | 9,336,460 |
kWh
|
$0.036 |
Natural Gas | $267,558 | 74,360 |
MMBtu
|
$3.60 |
Other Energy | $167,967 | 72,494 |
MMBtu
|
$2.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $698,612 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,323 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,720 | $12,717 |
$7,720
212,778
kWh
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $453 | $3,281 |
$453
12,603
kWh
|
- | - | - | - | |
03 | 2.4323: Use optimum size and capacity equipment | $1,856 | $2,388 |
$1,856
51,583
kWh
|
- | - | - | - | |
04 | 2.8113: Purchase gas directly from a contract gas supplier | $39,032 | $2,500 | - | - | - | - | $39,032 | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $8,150 | $1,100 | - |
$8,150
-
Tgal
|
- | - | - | |
06 | 3.5311: Recover and reuse waste material | $48,600 | $25,000 | - | - |
$48,600
-
lb
|
- | - | |
07 | 3.2176: Increase use of automation | $592,801 | $1,500,000 |
$(-5,599.0)
(-155,627)
kWh
|
- | - | $598,400 | - | |
TOTAL RECOMMENDED | $698,612 | $1,546,986 |
$4,430
121,337
kWh
|
$8,150
-
Tgal
|
$48,600
-
lb
|
$598,400 | $39,032 | ||
TOTAL IMPLEMENTED | $16,323 | $17,098 |
$8,173
225,381
kWh
|
$8,150
-
Tgal
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs