Assessment Year | 1997 |
---|---|
Principal Product | Plastic Screen Printed Interior Signs |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
75,298
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 6,136
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,751 | 1,942,556 |
kWh
|
$0.033 |
Electricity Demand | $37,100 | 5,273 |
kW-mo/yr
|
$7.04 |
Electricity Fees | $1,922 | - |
|
- |
Natural Gas | $16,609 | 3,559 |
MMBtu
|
$4.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,261 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,856 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,495 | $6,331 |
$2,338
70,926
kWh
|
$1,157
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $704 | - |
$704
21,395
kWh
|
- | - | - | - | - | |
03 | 3.4115: Recover and reuse cooling water | $8,657 | $9,360 |
$(-652.0)
(-19,637)
kWh
|
$(-270.0)
-
kW-mo/yr
|
$6,480
-
Tgal
|
- | - |
$3,099
-
Tgal
|
|
04 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $7,401 | $25,100 |
$(-64.0)
(-2,052)
kWh
|
$(-630.0)
-
kW-mo/yr
|
- |
$8,095
-
lb
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $48,004 | $8,444 |
$111
3,517
kWh
|
$(-363.0)
-
kW-mo/yr
|
- | - | $48,256 | - | |
TOTAL RECOMMENDED | $68,261 | $49,235 |
$2,437
74,149
kWh
|
$(-106.0)
-
kW-mo/yr
|
$6,480
-
Tgal
|
$8,095
-
lb
|
$48,256 |
$3,099
-
Tgal
|
||
TOTAL IMPLEMENTED | $12,856 | $15,691 |
$2,390
72,684
kWh
|
$887
-
kW-mo/yr
|
$6,480
-
Tgal
|
- | - |
$3,099
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs