ITAC Assessment: DS0074
ITAC logo
ITAC Assessment: DS0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Industrial Ovens and Furnaces
NAICS
n/a
SIC 3156:
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 148,800
ft2
Annual Production 208
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,658 3,925,557
kWh
Electricity Demand $78,976 10,548
kW-mo/yr
Electricity Fees $7,342 -
Natural Gas $92,177 42,104
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,068

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,466 $14,848 $7,794
236,225
kWh
$5,672
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $168 $1,484 $96
2,931
kWh
$72
-
kW-mo/yr
- - -
03 3.2123: Convert to high volume low pressure (hvlp) paint guns $57,080 $6,500 - - - $55,120
-
gal
$1,960
-
lb
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $336 $240 $336
10,258
kWh
- - - -
05 2.7261: Install timers and/or thermostats $4,018 $2,250 - - $4,018
-
MMBtu
- -
TOTAL RECOMMENDED $75,068 $25,322 $8,226
249,414
kWh
$5,744
-
kW-mo/yr
$4,018
-
MMBtu
$55,120
-
gal
$1,960
-
lb
TOTAL IMPLEMENTED $75,068 $25,322 $8,226
249,414
kWh
$5,744
-
kW-mo/yr
$4,018
-
MMBtu
$55,120
-
gal
$1,960
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs