ITAC Assessment: DS0067
ITAC logo
ITAC Assessment: DS0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Cheese and Whey
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 39,478
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,759 5,102,579
kWh
Electricity Demand $33,228 12,264
kW-mo/yr
Electricity Fees $16,237 -
Natural Gas $144,182 70,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $444 $4,230 $351
10,258
kWh
$93
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,024 $14,718 $4,122
120,164
kWh
$902
-
kW-mo/yr
- - -
03 2.2136: Install / repair insulation on steam lines $5,310 $8,238 $222
6,448
kWh
$49
-
kW-mo/yr
- $5,039
-
MMBtu
-
04 2.3212: Optimize plant power factor $9,685 $6,735 - - $9,685 - -
05 3.4114: Replace city water with recycled water via cooling tower $7,027 $2,390 $(-12.0)
(-293)
kWh
- - - $7,039
-
Tgal
06 3.5311: Recover and reuse waste material $773 $900 - - - - $773
-
Tgal
TOTAL RECOMMENDED $28,263 $37,211 $4,683
136,577
kWh
$1,044
-
kW-mo/yr
$9,685 $5,039
-
MMBtu
$7,812
-
Tgal
TOTAL IMPLEMENTED $17,156 $13,355 $339
9,965
kWh
$93
-
kW-mo/yr
$9,685 - $7,039
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs