ITAC Assessment: BD0140
ITAC logo
ITAC Assessment: BD0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Pallet Racking
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 425
Plant Area 410,000
ft2
Annual Production 70,000
ton
Production Hrs. Annual 8,112
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $484,812 12,685,815
kWh
Electricity Demand $352,886 25,121
kW-mo/yr
Electricity Fees $3,789 -
Natural Gas $554,035 194,467
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,409,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $428,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7231: Use radiant heater for spot heating $109,239 $255,000 $806
21,395
kWh
$334
-
kW-mo/yr
$108,099
-
MMBtu
- - - - -
02 2.4133: Use most efficient type of electric motors $15,134 $17,430 $10,746
281,360
kWh
$4,388
-
kW-mo/yr
- - - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,301 $500 $7,967
214,537
kWh
$4,334
-
kW-mo/yr
- - - - - -
04 2.2437: Recover waste heat from equipment $9,606 $5,600 - - $9,606
-
MMBtu
- - - - -
05 2.2511: Insulate bare equipment $5,577 $2,736 - - $5,577
-
MMBtu
- - - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,041 $840 $1,450
38,101
kWh
$591
-
kW-mo/yr
- - - - - -
07 2.7135: Install occupancy sensors $855 $525 $459
12,016
kWh
$396
-
kW-mo/yr
- - - - - -
08 3.2121: Convert to electrostatic powder coating $837,135 $1,600,000 - - - - $837,135
-
gal
- - -
09 3.4156: Use flow control valves on equipment to optimize water use $30,353 $10,000 - - - $30,353
-
Tgal
- - - -
10 3.4114: Replace city water with recycled water via cooling tower $3,427 $3,000 $(-827.0)
(-21,688)
kWh
$(-337.0)
-
kW-mo/yr
- $4,591
-
Tgal
- - - -
11 3.4151: Minimize water usage $1,471 $2,590 - - - $1,471
-
Tgal
- - - -
12 4.441: Install automatic packing equipment $243,360 $500,000 - - - - - $243,360 - -
13 4.231: Purchase equipment instead of leasing $107,799 $26,500 $(-5,960.0)
(-155,920)
kWh
$(-3,241.0)
-
kW-mo/yr
- - - - - $117,000
14 4.652: Replace existing equipment with more suitable substitutes $31,200 $16,000 - - - - - $15,600 $15,600 -
TOTAL RECOMMENDED $1,409,498 $2,440,721 $14,641
389,801
kWh
$6,465
-
kW-mo/yr
$123,282
-
MMBtu
$36,415
-
Tgal
$837,135
-
gal
$258,960 $15,600 $117,000
TOTAL IMPLEMENTED $428,525 $556,430 $3,457
96,718
kWh
$1,684
-
kW-mo/yr
- $31,824
-
Tgal
- $258,960 $15,600 $117,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs