ITAC Assessment: DS0063
ITAC logo
ITAC Assessment: DS0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Roof & Floor Trusses and wooden boxes & crates
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 189,750
ft2
Annual Production 115,000
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,428 977,726
kWh
Electricity Demand $27,365 4,092
kW-mo/yr
Electricity Fees $3,633 -
Natural Gas $25,010 7,636
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,301 $400 $778
46,307
kWh
$523
-
kW-mo/yr
- -
02 2.7224: Reduce space conditioning during non-working hours $4,215 $600 - - $4,215
-
MMBtu
-
03 3.5315: Lease / purchase baler; sell cardboard to recycler $1,305 $4,750 - - - $1,305
-
lb
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,851 $20,100 $2,567
82,649
kWh
$1,284
-
kW-mo/yr
- -
TOTAL RECOMMENDED $10,672 $25,850 $3,345
128,956
kWh
$1,807
-
kW-mo/yr
$4,215
-
MMBtu
$1,305
-
lb
TOTAL IMPLEMENTED $1,301 $400 $778
46,307
kWh
$523
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs