ITAC Assessment: DS0056
ITAC logo
ITAC Assessment: DS0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Molded and Printed Plastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 132
Plant Area 73,342
ft2
Annual Production 33,000,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,771 1,815,944
kWh
Electricity Demand $51,477 7,356
kW-mo/yr
Electricity Fees $1,031 -
Natural Gas $4,584 798
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,100 $28,666 $4,261
129,250
kWh
$3,839
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $1,391 $4,503 $566
17,292
kWh
$825
-
kW-mo/yr
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $680 - - $680
-
kW-mo/yr
-
04 3.5111: Filter and reuse hydraulic oil $1,470 $4,800 - - $1,470
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $960 $80 - $960
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,601 $38,049 $4,827
146,542
kWh
$6,304
-
kW-mo/yr
$1,470
TOTAL IMPLEMENTED $8,100 $28,666 $4,261
129,250
kWh
$3,839
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs