Assessment Year | 1996 |
---|---|
Principal Product | Beer and Soft Drinks |
NAICS |
n/a
|
SIC | 2082: Malt Beverages |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
35,000
ft2
|
Annual Production | 93,750
bbl
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,140 | 900,645 |
kWh
|
$0.043 |
Electricity Fees | $331 | - |
|
- |
Natural Gas | $50,982 | 19,490 |
MMBtu
|
$2.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,864 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,973 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,286 | $5,824 |
$2,286
53,048
kWh
|
- | |
02 | 2.2511: Insulate bare equipment | $1,128 | $4,648 |
$311
9,965
kWh
|
$817
-
MMBtu
|
|
03 | 2.2135: Repair and eliminate steam leaks | $530 | $800 | - |
$530
-
MMBtu
|
|
04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $5,891 | $9,600 | - |
$5,891
-
MMBtu
|
|
05 | 2.2441: Preheat boiler makeup water with waste process heat | $1,029 | $1,000 | - |
$1,029
-
MMBtu
|
|
TOTAL RECOMMENDED | $10,864 | $21,872 |
$2,597
63,013
kWh
|
$8,267
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,973 | $12,272 |
$2,597
63,013
kWh
|
$2,376
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs