ITAC Assessment: DS0052
ITAC logo
ITAC Assessment: DS0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Beer and Soft Drinks
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 35,000
ft2
Annual Production 93,750
bbl
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,140 900,645
kWh
Electricity Fees $331 -
Natural Gas $50,982 19,490
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,973

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,286 $5,824 $2,286
53,048
kWh
-
02 2.2511: Insulate bare equipment $1,128 $4,648 $311
9,965
kWh
$817
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $530 $800 - $530
-
MMBtu
04 2.2444: Use hot process fluids to preheat incoming process fluids $5,891 $9,600 - $5,891
-
MMBtu
05 2.2441: Preheat boiler makeup water with waste process heat $1,029 $1,000 - $1,029
-
MMBtu
TOTAL RECOMMENDED $10,864 $21,872 $2,597
63,013
kWh
$8,267
-
MMBtu
TOTAL IMPLEMENTED $4,973 $12,272 $2,597
63,013
kWh
$2,376
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs