ITAC Assessment: DS0046
ITAC logo
ITAC Assessment: DS0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product PVC Pipes
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 57,075
ft2
Annual Production 43,000,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,817 8,082,063
kWh
Electricity Demand $93,417 10,325
kW-mo/yr
Electricity Fees $6,873 -
Natural Gas $4,801 458
MMBtu
LPG $4,131 722
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,571

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $2,571 $4,376 $2,024
72,392
kWh
$547
-
kW-mo/yr
- - -
02 3.1191: Change procedures / equipment / operating conditions $22,086 $24,850 $2,368
84,701
kWh
$517
-
kW-mo/yr
- $19,201
-
Tgal
-
03 3.5316: Contract a wood pallet recycling company $22,468 $24,690 - - - - $22,468
-
lb
04 2.2511: Insulate bare equipment $5,944 $1,954 $5,525
197,245
kWh
$1,040
-
kW-mo/yr
$(-621.0)
-
MMBtu
- -
TOTAL RECOMMENDED $53,069 $55,870 $9,917
354,338
kWh
$2,104
-
kW-mo/yr
$(-621.0)
-
MMBtu
$19,201
-
Tgal
$22,468
-
lb
TOTAL IMPLEMENTED $2,571 $4,376 $2,024
72,392
kWh
$547
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs