ITAC Assessment: DS0025
ITAC logo
ITAC Assessment: DS0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Aluminum Extrusions
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 291
Plant Area 78,800
ft2
Annual Production 8,200,000
lb
Production Hrs. Annual 7,904
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,451 6,385,405
kWh
Natural Gas $31,786 7,130
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,317 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $593

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,241 $26,630 $7,241
164,713
kWh
-
02 2.2437: Recover waste heat from equipment $295 $175 - $295
-
MMBtu
03 2.4133: Use most efficient type of electric motors $7,821 $21,444 $7,821
170,574
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $298 $409 $298
7,620
kWh
-
05 2.2511: Insulate bare equipment $1,473 $198 $1,473
37,222
kWh
-
06 2.2511: Insulate bare equipment $3,189 $216 $3,189
72,685
kWh
-
TOTAL RECOMMENDED $20,317 $49,072 $20,022
452,814
kWh
$295
-
MMBtu
TOTAL IMPLEMENTED $593 $584 $298
7,620
kWh
$295
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs