Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Custom Thermoformed Packaging
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area 68,600
ft2
Annual Production 4,800,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,802 3,513,482
kWh
Natural Gas $27,202 5,141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,467 $6,256 $6,467
128,664
kWh
-
02 2.4133: Use most efficient type of electric motors $5,341 $2,913 $5,341
105,510
kWh
-
03 2.2511: Insulate bare equipment $6,957 $1,902 $6,957
145,369
kWh
-
04 2.7135: Install occupancy sensors $2,337 $900 $2,337
46,600
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $57,985 $473,000 $116,687
2,318,582
kWh
$(-58,702.0)
-
MMBtu
TOTAL RECOMMENDED $79,087 $484,971 $137,789
2,744,725
kWh
$(-58,702.0)
-
MMBtu
TOTAL IMPLEMENTED $6,957 $1,902 $6,957
145,369
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs