ITAC Assessment: DL0271
ITAC logo
ITAC Assessment: DL0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 15,988,855
ft2
Annual Production 492,537
ton
Production Hrs. Annual 2,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,066,832 7,642,237
kWh
Electricity Demand $203,243 44,254
kW-mo/yr
Electricity Fees $24,456 -
Natural Gas $724,926 141,902
MMBtu
Other Gas $31,438 1
MMBtu
TOTAL YEARLY COSTS $2,050,895
RECOMMENDED SAVINGS* $196,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $54,924 $200,000 $54,924
330,866
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,040 $12,900 $3,040
18,312
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,725 $23,500 $5,725
34,488
kWh
-
04 2.1221: Replace obsolete burners with more efficient ones $34,850 $150,000 - $34,850
-
MMBtu
05 2.4313: Provide proper maintenance of motor driven equipment $48,372 $50,000 $48,372
291,396
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $50,040 $42,000 $50,040
301,445
kWh
-
TOTAL RECOMMENDED $196,951 $478,400 $162,101
976,507
kWh
$34,850
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs