ITAC Assessment: DL0266
ITAC logo
ITAC Assessment: DL0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Plastic Parts for Boating Industry
NAICS 336612: Boat Building
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 23,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,750
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,307 175,436
kWh
Electricity Demand $5,130 368
kW-mo/yr
Electricity Fees $1,080 -
LPG $10,080 320
MMBtu
TOTAL YEARLY COSTS $37,597
RECOMMENDED SAVINGS* $13,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7224: Reduce space conditioning during non-working hours $1,316 - $1,055
8,717
kWh
$261
-
kW-mo/yr
-
02 2.2449: Recover heat from exhausted steam, hot air or hot water $1,212 $2,300 - - $1,212
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $689 $1,400 $552
4,565
kWh
$137
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $317 $500 $254
2,098
kWh
$63
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,109 $9,700 $1,690
13,967
kWh
$419
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,511 $2,607 $2,013
16,632
kWh
$499
-
kW-mo/yr
-
07 2.7243: Improve air circulation with destratification fans / other methods $988 $5,100 - - $988
-
MMBtu
08 2.7492: Use proper thickness of insulation on building envelope $1,533 $7,200 - - $1,533
-
MMBtu
09 2.7292: Lower ceiling to reduce conditioned space $2,537 $20,700 $(-389.0)
(-3,215)
kWh
$(-96.0)
-
kW-mo/yr
$3,022
-
MMBtu
TOTAL RECOMMENDED $13,212 $49,507 $5,174
42,764
kWh
$1,283
-
kW-mo/yr
$6,755
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs