| Assessment Year | 2025 |
|---|---|
| Principal Product | Asphalt |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
50,000
ft2
|
| Annual Production | 300,000
ton
|
| Production Hrs. Annual | 1,850
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $144,993 | 530,919 |
kWh
|
$0.27 |
| Electricity Demand | $59,962 | 3,080 |
kW-mo/yr
|
$19.47 |
| Electricity Fees | $240 | - |
|
- |
| Natural Gas | $163,436 | 32,687 |
MMBtu
|
$5.00 |
| TOTAL YEARLY COSTS | $368,631 | |||
| RECOMMENDED SAVINGS* | $120,053 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $43,100 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $43,100 | $30,000 |
$30,481
111,652
kWh
|
$12,619
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,975 | $20,000 |
$12,712
46,563
kWh
|
$5,263
-
kW-mo/yr
|
- | |
| 03 | 2.2136: Install / repair insulation on steam lines | $2,075 | $1,777 | - | - |
$2,075
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,102 | $10,000 |
$2,193
8,043
kWh
|
$909
-
kW-mo/yr
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $6,172 | $13,000 | - | - |
$6,172
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $35,225 | $8,950 | - | - |
$35,225
-
MMBtu
|
|
| 07 | 2.4322: Use or replace with energy efficient substitutes | $7,174 | $15,000 |
$5,074
18,586
kWh
|
$2,100
-
kW-mo/yr
|
- | |
| 08 | 2.1221: Replace obsolete burners with more efficient ones | $5,230 | $38,000 | - | - |
$5,230
-
MMBtu
|
|
| TOTAL RECOMMENDED | $120,053 | $136,727 |
$50,460
184,844
kWh
|
$20,891
-
kW-mo/yr
|
$48,702
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $43,100 | $30,000 |
$30,481
111,652
kWh
|
$12,619
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs