ITAC Assessment: DL0185
ITAC logo
ITAC Assessment: DL0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Treated Waste Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 11
Plant Area 440,000
ft2
Annual Production 418,922
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,011 3,024,953
kWh
Electricity Demand $23,369 5,512
kW-mo/yr
Electricity Fees $7,366 -
TOTAL YEARLY COSTS $216,746
RECOMMENDED SAVINGS* $48,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,360 $10,000 $9,360
140,100
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,630 $10,000 $9,630
142,390
kWh
03 2.4322: Use or replace with energy efficient substitutes $13,920 $100,000 $13,920
208,200
kWh
04 2.7234: Use heat pump for space conditioning $12,790 $35,300 $12,790
191,500
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,910 $1,594 $1,910
28,580
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $880 $1,036 $880
14,380
kWh
TOTAL RECOMMENDED $48,490 $157,930 $48,490
725,150
kWh
TOTAL IMPLEMENTED $16,710 $102,630 $16,710
251,160
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs