ITAC Assessment: DL0183
ITAC logo
ITAC Assessment: DL0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Filing Cabinets & Related Parts
NAICS 337214: Office Furniture (except Wood) Manufacturing
SIC 2522: Office Furniture, Except Wood
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 260,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,510 4,720,200
kWh
Electricity Demand $101,706 10,002
kW-mo/yr
Electricity Fees $8,088 -
Natural Gas $308,769 40,188
MMBtu
Waste Disposal Costs
Water Usage $16,257 5,409
Tgal
Water Disposal $36,433 5,409
Tgal
TOTAL YEARLY COSTS $762,763
RECOMMENDED SAVINGS* $104,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,743 $28,900 $17,743
213,781
kWh
-
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,766 $7,900 - $1,766
-
MMBtu
03 2.2437: Recover waste heat from equipment $8,601 $19,400 - $8,601
-
MMBtu
04 2.7241: Install outside air damper / economizer on hvac unit $68,890 $420,000 - $68,890
-
MMBtu
05 2.3511: Use plant owned transformers or lease transformers $7,082 $48,700 $7,082
85,324
kWh
-
TOTAL RECOMMENDED $104,082 $524,900 $24,825
299,105
kWh
$79,257
-
MMBtu
TOTAL IMPLEMENTED $75,972 $468,700 $7,082
85,324
kWh
$68,890
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs