Assessment Year | 2017 |
---|---|
Principal Product | Machining |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
75,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 6,936
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,188 | 1,520,525 |
kWh
|
$0.054 |
Electricity Demand | $69,077 | 4,457 |
kW-mo/yr
|
$15.50 |
Electricity Fees | $11,816 | - |
|
- |
Natural Gas | $9,057 | 1,065 |
MMBtu
|
$8.50 |
TOTAL YEARLY COSTS | $172,138 | |||
RECOMMENDED SAVINGS* | $43,799 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,194 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,570 | - |
$9,570
96,700
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,117 | - |
$3,117
31,490
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $2,480 | $1,690 | - |
$2,480
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $2,930 | $2,190 | - |
$2,930
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,415 | $16,875 |
$4,415
44,630
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,410 | $4,465 |
$6,410
64,770
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,798 | $4,484 |
$6,798
68,667
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,869 | $2,965 |
$1,869
18,877
kWh
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $880 | $800 |
$880
8,910
kWh
|
- | |
10 | 2.4322: Use or replace with energy efficient substitutes | $5,330 | $6,700 |
$5,330
53,900
kWh
|
- | |
TOTAL RECOMMENDED | $43,799 | $40,169 |
$38,389
387,944
kWh
|
$5,410
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,194 | $11,914 |
$18,194
183,804
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs