ITAC Assessment: DL0159
ITAC logo
ITAC Assessment: DL0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Acrylic Molding Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 90
Plant Area 205,000
ft2
Annual Production 180,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,639,954 27,577,200
kWh
Natural Gas $527,855 87,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $371,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $371,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 3.4114: Replace city water with recycled water via cooling tower $287,810 $31,000 - - $198,450
-
Tgal
$89,360
-
gal
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $48,000 $100,750 $48,000
500,000
kWh
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $7,300 $17,825 - $7,300
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $28,590 $188,100 $28,590
297,840
kWh
- - -
TOTAL RECOMMENDED $371,700 $337,675 $76,590
797,840
kWh
$7,300
-
MMBtu
$198,450
-
Tgal
$89,360
-
gal
TOTAL IMPLEMENTED $371,700 $337,675 $76,590
797,840
kWh
$7,300
-
MMBtu
$198,450
-
Tgal
$89,360
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs