ITAC Assessment: DL0158
ITAC logo
ITAC Assessment: DL0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range less than $500
k
# of Employees 260
Plant Area 570,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,000
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,395,119 21,915,639
kWh
Electricity Demand $556,698 49,574
kW-mo/yr
Electricity Fees $685 -
Natural Gas $661,508 115,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $591,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $481,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4224: Upgrade controls on compressors $1,270 $60 $1,270
19,868
kWh
- - -
02 2.7314: Reduce ventilation air $310,823 $38,750 $75,023
1,172,244
kWh
- $235,800
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $7,940 $1,480 - - $7,940
-
MMBtu
-
04 2.4321: Upgrade obsolete equipment $13,830 $11,600 - - - $13,830
05 2.7423: Reduce heat gain by window tinting $54,090 $104,500 $54,090
845,131
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $86,560 $331,000 $86,560
1,352,560
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $96,070 $380,000 $65,750
1,027,290
kWh
$30,320
-
kW-mo/yr
- -
08 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $20,534 $96,100 $10,850
169,563
kWh
- $9,684
-
MMBtu
-
TOTAL RECOMMENDED $591,117 $963,490 $293,543
4,586,656
kWh
$30,320
-
kW-mo/yr
$253,424
-
MMBtu
$13,830
TOTAL IMPLEMENTED $481,517 $619,350 $205,713
3,214,228
kWh
$30,320
-
kW-mo/yr
$245,484
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs