ITAC Assessment: DL0157
ITAC logo
ITAC Assessment: DL0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Carbonated Beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range greater than $500
M
# of Employees 1,000
Plant Area 200,000
ft2
Annual Production 62,400
Tgal
Production Hrs. Annual 6,006
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $715,588 10,624,770
kWh
Electricity Demand $113,938 25,627
kW-mo/yr
Electricity Fees $3,601 -
Natural Gas $152,739 34,176
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $169,275 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,995

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.6218: Turn off equipment when not in use $11,140 - $11,140
166,300
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,860 $2,250 $3,450
51,510
kWh
$410
-
kW-mo/yr
- -
03 3.4113: Treat and reuse rinse waters $34,545 $41,405 - - - $34,545
-
gal
04 2.2694: Use highest temperature for chilling or cold storage $8,290 $11,760 $7,320
109,300
kWh
$970
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $48,630 $79,420 $39,060
582,930
kWh
$9,570
-
kW-mo/yr
- -
06 2.7232: Replace existing hvac unit with high efficiency model $14,700 $44,740 - - $14,700
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,170 $77,500 $19,820
295,820
kWh
$2,350
-
kW-mo/yr
- -
08 2.2437: Recover waste heat from equipment $14,500 $53,850 $6,300
94,080
kWh
- $8,200
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $11,440 $46,960 $10,100
150,680
kWh
$1,340
-
kW-mo/yr
- -
TOTAL RECOMMENDED $169,275 $357,885 $97,190
1,450,620
kWh
$14,640
-
kW-mo/yr
$22,900
-
MMBtu
$34,545
-
gal
TOTAL IMPLEMENTED $93,995 $210,605 $41,060
612,800
kWh
$3,690
-
kW-mo/yr
$14,700
-
MMBtu
$34,545
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs