ITAC Assessment: DL0140
ITAC logo
ITAC Assessment: DL0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Baked Products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area 172,000
ft2
Annual Production 45,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,000,182 9,676,000
kWh
Electricity Demand $133,879 20,823
kW-mo/yr
Electricity Fees $10,138 -
Natural Gas $981,959 135,111
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $174,945

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $169,710 - $23,960
232,620
kWh
$2,060
-
kW-mo/yr
$143,690
-
MMBtu
02 2.2437: Recover waste heat from equipment $16,140 $5,060 - - $16,140
-
MMBtu
03 2.4322: Use or replace with energy efficient substitutes $5,235 $3,000 $4,760
46,200
kWh
$475
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $60,305 $98,895 $55,520
539,000
kWh
$4,785
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $3,810 $1,640 $3,510
34,080
kWh
$300
-
kW-mo/yr
-
06 2.2414: Use waste heat from hot flue gases to preheat $25,660 $74,190 - - $25,660
-
MMBtu
TOTAL RECOMMENDED $280,860 $182,785 $87,750
851,900
kWh
$7,620
-
kW-mo/yr
$185,490
-
MMBtu
TOTAL IMPLEMENTED $174,945 $3,000 $28,720
278,820
kWh
$2,535
-
kW-mo/yr
$143,690
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs