| Assessment Year | 2014 |
|---|---|
| Principal Product | Beer and Soda |
| NAICS | 312120: Breweries |
| SIC | 2082: Malt Beverages |
| Sales Range | $5 M to 10M |
| # of Employees | 30 |
| Plant Area |
19,100
ft2
|
| Annual Production | 35,000
bbl
|
| Production Hrs. Annual | 4,056
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $76,383 | 680,560 |
kWh
|
$0.11 |
| Natural Gas | $59,606 | 8,870 |
MMBtu
|
$6.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,510 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2121: Increase amount of condensate returned | $17,190 | $20,000 | - |
$7,800
-
MMBtu
|
$6,280
-
Tgal
|
$3,110
-
Tgal
|
|
| 02 | 2.4235: Remove or close off unneeded compressed air lines | $14,240 | $5,460 |
$14,240
127,170
kWh
|
- | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,900 | $38,400 |
$5,900
52,730
kWh
|
- | - | - | |
| 04 | 2.2441: Preheat boiler makeup water with waste process heat | $890 | $2,220 | - |
$890
-
MMBtu
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $1,520 | $8,430 |
$500
4,460
kWh
|
$1,020
-
MMBtu
|
- | - | |
| 06 | 2.2511: Insulate bare equipment | $745 | $160 | - |
$745
-
MMBtu
|
- | - | |
| 07 | 2.2136: Install / repair insulation on steam lines | $2,350 | $6,300 | - |
$2,350
-
MMBtu
|
- | - | |
| 08 | 2.2136: Install / repair insulation on steam lines | $970 | $1,200 | - |
$970
-
MMBtu
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $245 | $2,280 |
$245
2,195
kWh
|
- | - | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,820 | $10,075 |
$2,820
25,200
kWh
|
- | - | - | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $640 | $1,040 |
$640
5,710
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $47,510 | $95,565 |
$24,345
217,465
kWh
|
$13,775
-
MMBtu
|
$6,280
-
Tgal
|
$3,110
-
Tgal
|
||
| TOTAL IMPLEMENTED | $20,510 | $27,500 | - |
$11,120
-
MMBtu
|
$6,280
-
Tgal
|
$3,110
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs