Assessment Year | 2014 |
---|---|
Principal Product | Wastewater treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 50 |
Plant Area |
20,000
ft2
|
Annual Production | 850,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $465,906 | 4,695,356 |
kWh
|
$0.099 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,289 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $61,289 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,000 | $1,000 |
$9,000
90,600
kWh
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $54,689 | $88,625 |
$54,689
552,411
kWh
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $800 | $200 |
$800
8,100
kWh
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,400 | $800 |
$2,400
24,500
kWh
|
|
05 | 2.7141: Lower light fixtures in high ceiling areas | $3,400 | $8,400 |
$3,400
34,700
kWh
|
|
TOTAL RECOMMENDED | $70,289 | $99,025 |
$70,289
710,311
kWh
|
||
TOTAL IMPLEMENTED | $61,289 | $98,025 |
$61,289
619,711
kWh
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs