ITAC Assessment: DL0130
ITAC logo
ITAC Assessment: DL0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Wastewater treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 50
Plant Area 20,000
ft2
Annual Production 850,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $465,906 4,695,356
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,289

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $9,000 $1,000 $9,000
90,600
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $54,689 $88,625 $54,689
552,411
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $800 $200 $800
8,100
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,400 $800 $2,400
24,500
kWh
05 2.7141: Lower light fixtures in high ceiling areas $3,400 $8,400 $3,400
34,700
kWh
TOTAL RECOMMENDED $70,289 $99,025 $70,289
710,311
kWh
TOTAL IMPLEMENTED $61,289 $98,025 $61,289
619,711
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs