ITAC Assessment: DL0099
ITAC logo
ITAC Assessment: DL0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Clean Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 6
Plant Area 652,400
ft2
Annual Production 730,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,532 2,467,200
kWh
Electricity Demand $17,041 5,142
kW-mo/yr
Natural Gas $78,819 6,874
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $337,014 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,014

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,066 $12,089 $2,066
21,497
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,900 $11,930 $2,900
35,400
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,698 $17,843 $6,698
81,687
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,410 $100 $2,410
29,400
kWh
05 2.2211: Use optimum temperature $2,940 $100 $2,940
35,800
kWh
06 2.1336: Install equipment to utilize waste fuel $320,000 $3,600,000 $320,000
11,169,000
kWh
TOTAL RECOMMENDED $337,014 $3,642,062 $337,014
11,372,784
kWh
TOTAL IMPLEMENTED $17,014 $42,062 $17,014
203,784
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs