ITAC Assessment: DL0095
ITAC logo
ITAC Assessment: DL0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product corrugated containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 90,000
ft2
Annual Production 612,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,593 6,376,610
kWh
Electricity Demand $98,129 12,952
kW-mo/yr
Natural Gas $420,968 65,624
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,056 $700 $4,056
57,943
kWh
-
02 2.2135: Repair and eliminate steam leaks $6,024 $600 - $6,024
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,524 $28,000 $14,717
210,240
kWh
$(-5,192.5)
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,942 $13,697 $19,942
284,887
kWh
-
05 2.2449: Recover heat from exhausted steam, hot air or hot water $18,910 $6,300 - $18,910
-
MMBtu
TOTAL RECOMMENDED $58,456 $49,297 $38,715
553,070
kWh
$19,742
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs