ITAC Assessment: DL0084
ITAC logo
ITAC Assessment: DL0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Aluminium Horse Shoe
NAICS 332112: Nonferrous Forging
SIC 3463: Nonferrous Forgings
Sales Range $1
M
to 5
M
# of Employees 41
Plant Area 11,200
ft2
Annual Production 571,428
units
Production Hrs. Annual 6,240
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,833 1,052,100
kWh
Natural Gas $40,556 5,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,825

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1133: Adjust burners for efficient operation $1,825 $500 - $1,825
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $8,216 $35,000 - $8,216
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $6,919 $20 $2,096
16,000
kWh
$4,823
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,252 $20 $3,252
24,826
kWh
-
TOTAL RECOMMENDED $20,212 $35,540 $5,348
40,826
kWh
$14,864
-
MMBtu
TOTAL IMPLEMENTED $1,825 $500 - $1,825
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs