ITAC Assessment: DL0082
ITAC logo
ITAC Assessment: DL0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Heterocyclic Hydrocarbons
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 35
Plant Area 20,000
ft2
Annual Production 220
lb
Production Hrs. Annual 4,420
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,625 1,144,465
kWh
Natural Gas $83,435 6,550
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $64,179 $280,000 $32,844
276,000
kWh
$31,335
-
MMBtu
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $18,536 $46,000 $3,887
32,667
kWh
$14,649
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,641 $1,330 $4,641
39,000
kWh
-
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $716 $90 $716
6,000
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,636 $2,100 $1,636
13,750
kWh
-
TOTAL RECOMMENDED $89,708 $329,520 $43,724
367,417
kWh
$45,984
-
MMBtu
TOTAL IMPLEMENTED $5,357 $1,420 $5,357
45,000
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs