ITAC Assessment: DL0078
ITAC logo
ITAC Assessment: DL0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Recycled press Fiberboard
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 500,000
ft2
Annual Production 99,999
units
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,199,591 44,102,220
kWh
Natural Gas $6,390,893 1,089,347
MMBtu
LPG $60,037 3,365
MMBtu
Fuel Oil #2 $18,153 1,040
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $552,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1224: Replace boiler $123,207 $900,000 - $123,207
-
MMBtu
02 2.7231: Use radiant heater for spot heating $191,452 $500,000 - $191,452
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,553 $42,800 $30,553
418,530
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $57,285 $28,500 $57,285
784,730
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $33,872 $165,720 $33,872
464,000
kWh
-
06 2.7144: Install spectral reflectors / delamp $14,637 $800 $14,637
200,500
kWh
-
07 2.7496: Install partitions to reduce size of conditioned space $77,835 $42,650 $(-4,303.0)
(-58,950)
kWh
$82,138
-
MMBtu
08 2.2136: Install / repair insulation on steam lines $23,761 $22,500 - $23,761
-
MMBtu
TOTAL RECOMMENDED $552,602 $1,702,970 $132,044
1,808,810
kWh
$420,558
-
MMBtu
TOTAL IMPLEMENTED $77,835 $42,650 $(-4,303.0)
(-58,950)
kWh
$82,138
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs