Assessment Year | 2011 |
---|---|
Principal Product | Recycled press Fiberboard |
NAICS | 322130: Paperboard Mills |
SIC | 2631: Paperboard Mills |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
500,000
ft2
|
Annual Production | 99,999
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,199,591 | 44,102,220 |
kWh
|
$0.073 |
Natural Gas | $6,390,893 | 1,089,347 |
MMBtu
|
$5.87 |
LPG | $60,037 | 3,365 |
MMBtu
|
$17.84 |
Fuel Oil #2 | $18,153 | 1,040 |
MMBtu
|
$17.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $552,602 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,835 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $123,207 | $900,000 | - |
$123,207
-
MMBtu
|
|
02 | 2.7231: Use radiant heater for spot heating | $191,452 | $500,000 | - |
$191,452
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $30,553 | $42,800 |
$30,553
418,530
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $57,285 | $28,500 |
$57,285
784,730
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,872 | $165,720 |
$33,872
464,000
kWh
|
- | |
06 | 2.7144: Install spectral reflectors / delamp | $14,637 | $800 |
$14,637
200,500
kWh
|
- | |
07 | 2.7496: Install partitions to reduce size of conditioned space | $77,835 | $42,650 |
$(-4,303.0)
(-58,950)
kWh
|
$82,138
-
MMBtu
|
|
08 | 2.2136: Install / repair insulation on steam lines | $23,761 | $22,500 | - |
$23,761
-
MMBtu
|
|
TOTAL RECOMMENDED | $552,602 | $1,702,970 |
$132,044
1,808,810
kWh
|
$420,558
-
MMBtu
|
||
TOTAL IMPLEMENTED | $77,835 | $42,650 |
$(-4,303.0)
(-58,950)
kWh
|
$82,138
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs