ITAC Assessment: DL0062
ITAC logo
ITAC Assessment: DL0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Animal Vaccines
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $1
M
to 5
M
# of Employees 300
Plant Area 94,000
ft2
Annual Production 6
Tgal
Production Hrs. Annual 8,766
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,511,947 14,389,115
kWh
Natural Gas $362,987 31,691
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $10,000 $2,500 - $10,000
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,000 $15,930 $14,000
129,000
kWh
- -
03 2.2314: Replace heat treating oven with more efficient unit $10,000 $6,300 $10,000
96,000
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,200 $10,000 $8,200
76,300
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $8,400 $15,300 - $8,400
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,000 $5,000 $6,000
56,500
kWh
- -
07 3.4114: Replace city water with recycled water via cooling tower $3,500 $1,000 - - $3,500
-
Tgal
08 2.6212: Turn off equipment during breaks, reduce operating time $1,900 $30 $1,900
17,500
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $649 $1,331 $649
6,070
kWh
- -
10 2.7313: Recycle air for heating, ventilation and air conditioning $1,200 $2,500 - $1,200
-
MMBtu
-
11 2.4222: Install adequate dryers on air lines to eliminate blowdown $2,800 $10,000 $2,800
26,000
kWh
- -
12 2.1233: Analyze flue gas for proper air/fuel ratio $2,700 $10,000 - $2,700
-
MMBtu
-
13 2.7142: Utilize higher efficiency lamps and/or ballasts $233 $970 $233
2,182
kWh
- -
TOTAL RECOMMENDED $69,582 $80,861 $43,782
409,552
kWh
$22,300
-
MMBtu
$3,500
-
Tgal
TOTAL IMPLEMENTED $7,900 $5,030 $7,900
74,000
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs