ITAC Assessment: DL0075
ITAC logo
ITAC Assessment: DL0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Dental Impression Material
NAICS 339114: Dental Equipment and Supplies Manufacturing
SIC 3843: Dental Equipment and Supplies
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 160,250
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 5,200
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,073,366 8,610,480
kWh
Electricity Demand $180,315 20,035
kW-mo/yr
Natural Gas $182,356 18,751
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1392: Replace purchased steam with other energy source $17,900 $6,660 $5,600
45,200
kWh
$12,300
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,000 $10,910 $32,000
260,000
kWh
-
03 2.5111: Convert from indirect to direct fired systems $14,910 $47,500 - $14,910
-
MMBtu
04 2.2442: Preheat combustion air with waste heat $6,900 $2,920 $6,900
56,000
kWh
-
05 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $6,900 $9,250 $1,140
9,200
kWh
$5,760
-
MMBtu
06 2.2437: Recover waste heat from equipment $4,000 $5,000 - $4,000
-
MMBtu
07 2.2437: Recover waste heat from equipment $3,281 $5,000 - $3,281
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $719 $1,100 $719
5,800
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,400 $740 $1,400
11,400
kWh
-
TOTAL RECOMMENDED $88,010 $89,080 $47,759
387,600
kWh
$40,251
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs