Assessment Year | 2011 |
---|---|
Principal Product | Dental Impression Material |
NAICS | 339114: Dental Equipment and Supplies Manufacturing |
SIC | 3843: Dental Equipment and Supplies |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
160,250
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,073,366 | 8,610,480 |
kWh
|
$0.12 |
Electricity Demand | $180,315 | 20,035 |
kW-mo/yr
|
$9.00 |
Natural Gas | $182,356 | 18,751 |
MMBtu
|
$9.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,010 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1392: Replace purchased steam with other energy source | $17,900 | $6,660 |
$5,600
45,200
kWh
|
$12,300
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,000 | $10,910 |
$32,000
260,000
kWh
|
- | |
03 | 2.5111: Convert from indirect to direct fired systems | $14,910 | $47,500 | - |
$14,910
-
MMBtu
|
|
04 | 2.2442: Preheat combustion air with waste heat | $6,900 | $2,920 |
$6,900
56,000
kWh
|
- | |
05 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $6,900 | $9,250 |
$1,140
9,200
kWh
|
$5,760
-
MMBtu
|
|
06 | 2.2437: Recover waste heat from equipment | $4,000 | $5,000 | - |
$4,000
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $3,281 | $5,000 | - |
$3,281
-
MMBtu
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $719 | $1,100 |
$719
5,800
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,400 | $740 |
$1,400
11,400
kWh
|
- | |
TOTAL RECOMMENDED | $88,010 | $89,080 |
$47,759
387,600
kWh
|
$40,251
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs