Assessment Year | 2010 |
---|---|
Principal Product | Aircraft Arresting Systems |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 119 |
Plant Area |
125,625
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 3,510
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,606 | 1,693,212 |
kWh
|
$0.078 |
Electricity Demand | $83,987 | 488 |
kW-mo/yr
|
$172.10 |
Electricity Fees | $5,739 | - |
|
- |
Natural Gas | $36,512 | 2,761 |
MMBtu
|
$13.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $92,163 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,295 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $6,774 | - |
$6,774
86,849
kWh
|
- | - | |
02 | 2.6218: Turn off equipment when not in use | $4,044 | - |
$1,591
24,000
kWh
|
- |
$2,453
-
MMBtu
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $2,212 | - | - | - |
$2,212
-
MMBtu
|
|
04 | 2.7122: Disconnect ballasts | $1,481 | - |
$866
11,100
kWh
|
$615
-
kW-mo/yr
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,068 | - |
$1,068
13,697
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $4,117 | $690 | - | - |
$4,117
-
MMBtu
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $30,000 | $6,000 |
$25,500
301,000
kWh
|
$4,500
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $3,491 | $1,573 |
$3,491
44,753
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,972 | $3,840 |
$2,907
37,271
kWh
|
$2,065
-
kW-mo/yr
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,288 | $24,000 |
$11,278
144,585
kWh
|
$8,010
-
kW-mo/yr
|
- | |
11 | 2.7232: Replace existing hvac unit with high efficiency model | $750 | $2,800 |
$595
7,631
kWh
|
$155
-
kW-mo/yr
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,966 | $77,940 |
$8,626
110,596
kWh
|
$5,340
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $92,163 | $116,843 |
$62,696
781,482
kWh
|
$20,685
-
kW-mo/yr
|
$8,782
-
MMBtu
|
||
TOTAL IMPLEMENTED | $44,295 | $10,373 |
$37,428
453,930
kWh
|
$4,655
-
kW-mo/yr
|
$2,212
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs