ITAC Assessment: DL0044
ITAC logo
ITAC Assessment: DL0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Metal Light Gauge Rolling
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3355: Aluminum Rolling and Drawing, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 113
Plant Area 99,000
ft2
Annual Production 27,000
ton
Production Hrs. Annual 8,430
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,916,740 16,962,305
kWh
Natural Gas $1,458,268 102,695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $197,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $89,460 $41,150 - $89,460
-
MMBtu
02 2.2437: Recover waste heat from equipment $31,002 $5,550 - $31,002
-
MMBtu
03 2.2437: Recover waste heat from equipment $21,300 $575 - $21,300
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $12,400 $950 $12,400
110,000
kWh
-
05 2.2611: Moderate cooling tower outlet temperature $6,452 - $6,452
57,093
kWh
-
06 2.4131: Size electric motors for peak operating efficiency $37,189 $70,000 $37,189
329,107
kWh
-
TOTAL RECOMMENDED $197,803 $118,225 $56,041
496,200
kWh
$141,762
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings